Suluhu, Museveni sign deal to build the longest heated oil pipeline in the world at Ksh375.6 billion
The two countries entered a partnership to build a 1,443km (896 mile) oil pipeline to pump Uganda’s oil from the Albertine basin.
Accessibility Tools
The two countries entered a partnership to build a 1,443km (896 mile) oil pipeline to pump Uganda’s oil from the Albertine basin.